Fully let
Land Acquisition
Completed 2019
Permitting
Completed 2020
Design
Completed 2021
Construction
Started Q4 2021
Interim Power
17MW available now
Fit Out
Phase 1 available from Q4 2021
Operational
Q3 2022
Floors | 4 |
Level 1 | Plant |
Level 2 | Plant + White Space |
Level 3 | Plant + White Space |
Level 4 | Plant + White Space |
Data Halls | 9 |
MW per DH | 1.875 |
Floor to ceiling height | 5.5m |
Sqm. per DH | 905 |
Redundancy on Generators | N + 1 |
Redundancy on UPS | N + 1 |
Cooling System | Condenser water + CRAC units |
Cooling System Unit Redundancy | N + 2 |
AVAILABILITY
Shell and Core already constructed and available for occupation Q1 2021
POWER
20MW available now with a route to grow to +60MW of IT load
SCALE
Largest available capacity in Central London
LOCATION
At the heart of the UK’s financial centre
SUSTAINABILITY
Dock cooling option available
LONDON DOCKLANDS
12,000 sqm
20 MW
CUSTOMER FITOUT
From Q4 2021
Footprint: 12,000 sq m, plus 1,200 sq m office space
20MW capacity with potential to increase to 24MW