ECHELON AT DUB 10

OVERVIEW

  • Planning permission in place for a 44,323sqm data centre providing 84MW of capacity.
  • Exceptionally located 35 acre site on the M50 motorway, 20 minutes from Dublin Airport and less than 5 minutes from Grange Castle, Profile Park and Parkwest.
  • Work on Phase 1 has commenced with the development of 40MW of capacity which will be powered by the national grid.
  • Full planning permission in place for an 84MW on site power station (if required).
  • Carrier neutral – all major fibre networks in close proximity with four separate access point to the site.
  • Initial occupation from Q3 2020.
  • Fully customisable solutions available.
  • Expand as your requirement evolves– option of reserving future capacity.

For more detailed information, including additional images, maps, programme schedule and technical data please contact us.

CLONDALKIN, DUBLIN

84MW

44,323 sqm

Q3 2020

Initial occupation from Q3 2021