Land Acquisition
Completed 2018
Permitting
Completed 2020
Design
Complete 2021
Construction
Starts Q3 2021
Interim Power
Up to 20MW available for early access (Q2 2022)
Fit Out
Phase 1 available from Q2 2022
Operational
Q3 2022
Floors | 2 |
Level 1 | Plant + White Space + Office |
Level 2 | Plant + Office |
Data Halls | 10 (Total) |
MW per DH | 6.3 |
Floor to ceiling height | 5.5m |
Sqm. per DH | 1,850 |
Redundancy on Generators | N + 1 |
Redundancy on UPS | N + 1 |
Cooling System | Direct Air w/adiabatic trim cooling |
Cooling System Unit Redundancy | N + 1 |
FIRM POWER
Phase 1: 100MW of firm capacity available with scope to grow to 200MW
SUSTAINABILITY
>500MW of renewable power connected to the onsite sub-station. Direct connections for PPAs available
CONNECTIVITY
100 acre site with initial 35 acre being developed with scope for sustainable and renewable projects and additional data centre developments.
SCALABILITY
100 acre site with initial 35 acre being developed with scope for sustainable and renewable projects and additional data centre developments
ARKLOW, CO. WICKLOW
100MW
45,000 sqm
CUSTOMER FITOUT
From Q4 2021
RENEWABLES
>500MW of wind-generated renewable energy on-site
Footprint: 45,000 sq m, 100MW capacity
Potential Phase 2 growth to 300MW+